Setup SAP JCo V2 Connector and Boomi Runtime with SAP SNC Part 5 - Validating Connectivity between SAP and the Boomi Runtime


Overview

There are four parts to the setup of SAP SNC between Boomi and SAP.  The steps are:  

Part 5: Validate connectivity between SAP system and Boomi runtime via SAP SNC as a Server (LISTEN Operation) 

At the completion of this section, you will have successfully validated your SAP SNC setup between your Boomi runtime and SAP JCo V2 connection for the LISTEN operation (Boomi receiving IDocs from SAP) 

Prerequisites

Steps

1. Deploy your Boomi Listener process
2. Confirm that Boomi is connected to the correct SAP SNC port (48xx) User-added image User-added image User-added image
3. Test your RFC Connection with SAP SNC setup User-added image User-added image