How Boomi divides work over a number of concurrent threads in a flow control

Document created by Nikita_nandakumar on Jul 22, 2014
Version 1Show Document
  • View in full screen mode
For instance :

If the number of threads = 2 say thread A and thread B

and if there are 5 documents fetched by an external system say 1,2,3,4 and 5.


The flow control step will create two groups - say Group 1 and Group 2 based on the number of threads (here A and B) :

Group 1 with documents 1-3
Group 2 with documents 4-5

Both groups are executed concurrently.

Unfortunately you wouldn't be able to configure how the data are assigned to the groups.

Reference :
http://help.boomi.com/atomsphere/GUID-79CB1CBE-34BF-4D76-A923-4348F16A44C1.html

Attachments

    Outcomes