AnsweredAssumed Answered

Not receiving the first IDoc after deploy of process with SAP connector (listener)

Question asked by BrandonHilton2441 on Jul 14, 2015
Latest reply on Jul 14, 2015 by BrandonHilton2441
I have noticed after deploying a change to a process with the SAP connector (listener), we sometimes do not receive the first IDoc, but will all afterwards.   This is dangerous so we need to find a resolution before deploying to PRD.  What might be causing this?  

Any settings I should consider changing here?
Maxium Idle Connections: 5
Maximum Active Connections: 10
Idle Time: 900000

Outcomes